Monday, May 13, 2013

NUK: also liar standing nuclear operator revealed (quite correct)

And if you do not wrote in the memorandum and in case of this,, which is which is does not know Thereare later also become 探出.
In that note. Nuclear Regulatory Commission, decided for the Japan Atomic Energy Agency based on the nuclear reactor regulation law, ordered the decommissioned prototype breeder reactor "monju" Tsuruga-Shi, Fukui. Issue violates the Bylaws have kept close to 10000 equipment inspection based on heavily.
Without time limit to review overall safety management system without a resume.
In the same article included, such as "ex-cons".
Said was a way of thinking that voluntarily before the East Japan earthquake country have ordered 1 year driving suspension in a false report of a sodium leak accident 9/1997, concerning the monju is deceived by safety myth made up himself, goes wrong anyway not matter so better hide.
However, after the experience of that State according to the above news details are unclear, nuclear power plant caused serious accidents in Japan, 1 region uninhabitable for man standing not changing "better hide problems",.
An indefinite suspension order is somehow like indefinitely suspended, ponderous, but seems "not restart without time limit to review overall safety management system" means. However, "to have could be wrote before, liar children lose touch lie is difficult.
Is never alone, adult liars they interfere lie?
Below, a write too little part is removed.
Reference material for the article at the beginning of trying to link below instead.
In Ministry meetings to a State regulatory agency acted in stage last December report publication.
05 / 13 / 2013 |
"Article category name: email address: (not published on the Web) to register the address (URL): the information content: